Back to News

Back-up power test to be conducted Tuesday at Operations Support Center

There will be a back-up power test to check on some repairs and changes made to back-up power at the Specialty Pharmacy in the WVU Medicine Operations Support Center (ROC II) Tuesday (Feb. 27) at 6 a.m.

The test should last no longer than 15 minutes and it will only affect those in the Operations Support Center.