Back to News

Work on eighth floor connector bridge has begun

The flooring on the eighth floor connector bridge between the main J.W. Ruby Memorial Hospital and the southeast tower will be replaced, starting June 18 and finishing on July 1.

Work will be done at night to minimize disruptions.

This map illustrates the affected area.